Hirakud Hydro Electric Project, Burla
| Category | Revised Sanctioned Strength | Man in Position on Dt.-01.04.2026 |
|---|---|---|
| Administrative Non-Executive (ANE) | 46 | 08 |
| Technical Non-Executive (TNE) | 187 | 73 |
| Total | 233 | 81 |
| Category | Revised Sanctioned Strength | Man in Position on Dt.-01.04.2026 |
|---|---|---|
| Administrative Non-Executive (ANE) | 46 | 08 |
| Technical Non-Executive (TNE) | 187 | 73 |
| Total | 233 | 81 |
High Saturation