Upper Indravati Hydro Electric Project, Mukhiguda
| Category | Revised Sanction Strength | Man in Position on dt- 01.04.2026 |
|---|---|---|
| Administrative Non-Executive | 50 | 14 |
| Technical Non-Executive | 171 | 54 |
| CK | -- | 07 |
| Total | 221 | 75 |
| Category | Revised Sanction Strength | Man in Position on dt- 01.04.2026 |
|---|---|---|
| Administrative Non-Executive | 50 | 14 |
| Technical Non-Executive | 171 | 54 |
| CK | -- | 07 |
| Total | 221 | 75 |
High Saturation