Upper Kolab Hydro Electric Project, Bariniput
| Category | Revised Sanction Strength | Man in Position on dt.-01.04.2026 |
|---|---|---|
| Administrative Non-Executive | 49 | 16 |
| Technical Non-Executive | 153 | 66 |
| Total | 202 | 82 |
| Category | Revised Sanction Strength | Man in Position on dt.-01.04.2026 |
|---|---|---|
| Administrative Non-Executive | 49 | 16 |
| Technical Non-Executive | 153 | 66 |
| Total | 202 | 82 |
High Saturation