OHPC Hydro Power Plant

Khatiguda (Water Conductor System)

Tailrace channel and Satiguda reservoir 

The Kolab water after generation passes through a tailrace channel of 900 Meters long with bed width 25 Meters. This tailrace channel discharges the flow in to a small stream Sati nalla across which an earthen dam with a central spillway is constructed to impound a reservoir known as” Satiguda Pond”. The Satiguda dam is a homogeneous earth dam of length 1144.15 Meters and maximum height is 16.84 Meters. The spillway is of central open type of 74 Meters long and the maximum height from foundation is 22.50 Meters.

Developed Head
Maximum Gross (FRL 642, TWL 263) 379 m
Minimum Gross (MRRL 625, TWL 267) 358 m
Water Ways
Head Race Channel – Length 335 m
Head Race Channel – Minimum Width 37.5 m
Head Race Tunnel 7.0 m I.D
Intake Level 621 m
Shape Circular
Diameter 7.0 m
Intake
Type Horizontal inlet type with trash racks
Gate Size (No / Width / Height) 1 / 5.75 / 8 m
Tunnel Length 3.934 km
Design Flow 210 Cum/sec
Lining Concrete 0.3 m
Surge Tank (Restricted Orifice Type)
Diameter 20 m
Height 132 m
Maximum Surge Level 670.9 m
Minimum Surge Level 622.23 m
Bottom Level of Surge Tank at C/S of Tunnel 585.220 m
Bottom Level of Surge Tank excluding C/S of Tunnel 593.42 m
Lining Thickness RCC 0.45 m
Pressure Tunnels
Number 02
Length 298 m
Diameter 5.25 m
Bottom Level of Pressure Tunnel 586.095 m
Lining Thickness (Steel Liner ASTM 537 Class-2 with stiffener) 0.3 m
Liner Plate Thickness 16 mm
Penstock
Number 04
Diameter 3.5 m
Length 790 m
Plate Thickness (Maximum) 45 mm
Plate Thickness (Minimum) 22 mm
Tail Race Channel
Base Level 260 m
Length 9 km
Width (Bed Maximum) 20 m
Width (Bed Minimum) 18 m
Concrete Lining Thickness 0.15 m
Discharge 210 Cum/sec
Depth at Maximum Flow 5.0 m
By Pass Tunnel at Right Dyke No. III
Bed Level 620 m
Shape Horse Shoe
Length 254 m
Maximum Diameter 3.5 m

Link Channels

Since the reservoir will cover four different sub basins of the river Indravati and its tributaries, link channels will be provided to ensure that when drawn, the reservoir does not become isolated pools. There are two such channels Guntrukhal and Kusumpadar. Guntrukhal link canal is 1.523 M long and has a bed elevation of 613 M. Kusumpadar is 1.550 M. long with a bed elevation of 620 M. These works have been completed.

Power Complex

Water for power generation will be taken from the reservoir by an intake structure near the upper reach of the reservoir. It will pass through a Head Race Tunnel 7.0 m. in diameter and 30934 m. long designed for 210 Cumecs of flow. Upon reaching a surge chamber, the tunnel gets divided into two pressure tunnels of 5.25 m diameter each leading to Valve House. Four penstock of 3.50 m. diameter, descend from valve house to power turbine driving 4 Nos. of 150 MW Generators. The Power House discharges into a Tail race channel of 9 Km. length to discharge into Hati Pond near Village Mangalpur for irrigation. The penstock work has been completed. The commercial Power Generation from Unit-I, Unit-II, Unit-III and Unit-IV is going on.

Sit Check Dam

The work of silt check dam upto RL 626M is completed by M/s. TSS(JV). Balance portion of silt check dam from RL 626.00M to 640.00M and excavation of link cut at Kokelpadar which was executed by M/s D.D. Builders has also been completed. Damages has been occurred to the silt check dam during the monsoon year 2003 – 04. As per special conditions of the contract, the agency has to make good to the damages at his own cost and to excavate the link cut up to RL 630.00mtr. But the agency did not pay any heed to restore the damage work as also to excavate the link cut channel and file a writ petition in Honourable High Court for release of his withheld amount. A notice on writ petition No. 15512/08 of Honourable High Court of Orissa has been served to the Agency M/s. DD Builders on the approval of Corporate Office. Action is being taken to close the contract as per relevant clause of the agreement.

Irrigation By Pass Tunnel

An emergency irrigation outlet is provided in the right dyke No.3 providing utp 100 m3 /s of water of the Hati Barrage pond when the power house is not generating. It consists of an intake set deep in the reservoir and a 3.5m diameter tunnel 250m.long discharging to a natural channel leading to the Hati river and the barrage po9nd. The work has been completed

Accessibility Adjustments

Content Adjustments

Decrease Font Size
Default Font Size
Increase Font Size
Highlight Titles
Text Magnifier

Color Adjustments

Light Contrast Theme
Dark Contrast Theme
High Contrast
Monochrome
Adjust Text Colors
High Saturation
Adjust Title Colors

Orientation Adjustments

Hide Images
Highlight Hover
Big Black Cursor
Big White Cursor